Carlton House, Luton LU4

Location:

Luton, Bedfordshire

No. of Modules/Units: studio's & apartments: 111
Year: 2017 - Start date: Sept. 2017 / Completion date: Nov. 2018
Design & Build
Status: Completed

Mechanical Services:

  • Above ground drainage installation
  • Rainwater alterations
  • Boosted cold water services & plant room
  • Hot and cold water services
  • Thermal insulation
  • Ventilation & ducting system install – MEV/MVHR
  • Sanitary ware installation
  • Sprinkler installation
  • Dry riser alterations
  • Testing and commissioning including chlorination and sterilisation
  • As built drawings
  • Operation and maintenance manuals

  • Client:

    Stay City

    Electrical Services:

  • New build wiring
  • Data cabling
  • Lighting control
  • Emergency lighting
  • Containment installation
  • Lighting design
  • Electrical testing
  • Access control
  • Automated gates & roller shutters
  • Audio & video intercom systems
  • Satellite systems
  • Induction loop
  • Fire alarm systems
  • Aspiration systems
  • AOV systems
  • Smoke ventilation
  • Description of property/project:

    The project in Luton will offer a variety of new studio, one & two bedroom apartments, just a 10 minute walk from Luton station which offers fast connectivity to London St Pancras in just 24 minutes.

    Set within a former office building, apartments will boast luxurious specifications such as oak one-strip flooring and contemporary décor. Situated just a three minute walk from Luton’s largest shopping centre, The Mall, residents will be well-placed for a convenient lifestyle.

     

    FIND OUT MORE

    Quick Form
    Sending

    OUR LATEST PROJECTS

    TOP